What should I do if I want to use my alternative power source (e.g. generator) during Load Management
If it is a generator, the isolator should be on the OFF position and be manually restored to BPC supply after the load management period of 4 hours.
By godiraone|2025-04-02T23:21:29+02:00April 2, 2025|Comments Off on What should I do if I want to use my alternative power source (e.g. generator) during Load Management